The Rajendra Residence
Phase 2 · Demolition
64% completeOn schedule
Builder command centre
3 sites
Phase 2 · Demolition
Phase 6 · Finishing
Phase 2 · Demolition
The Allure portals are built for a laptop screen — the workspace, the phase tracker and the site grid all assume the room. Open this page at 1024px or wider to continue.
Back to Allure